Third Biennial Report of the Oregon State Highway Commission Covering the Period December 1st, 1916 to November 30th, 1918
Free

Third Biennial Report of the Oregon State Highway Commission Covering the Period December 1st, 1916 to November 30th, 1918

By Herbert Nunn, R. A. Booth, W. L. Thompson, Simon Benson
Free
Book Description
Table of Contents
  • LETTER OF TRANSMITTAL
  • TABLE OF CONTENTS
  • LIST OF ILLUSTRATIONS
    • FINANCIAL STATEMENT OREGON STATE HIGHWAY COMMISSION
      • STATEMENT FOR THE BIENNIUM ENDING NOVEMBER 30, 1918
      • SUMMARY
    • STATEMENT FOR THE BIENNIUM ENDING NOVEMBER 30, 1918
    • SUMMARY
  • LETTER OF TRANSMITTAL
    • WORK ACCOMPLISHED
    • MONEYS AVAILABLE AND EXPENDED
    • PAVING
    • MACADAMIZING
    • GRADING
    • BRIDGES
    • ELIMINATION OF GRADE CROSSINGS
    • FEDERAL CO-OPERATION
    • POST ROAD PROJECTS
    • FOREST ROAD PROJECTS
      • POST ROAD PROJECTS PROJECTS AGREED UPON TO NOVEMBER 30, 1918
      • FOREST ROAD PROJECTS PROJECTS APPROVED TO NOVEMBER 30, 1918
    • POST ROAD PROJECTS PROJECTS AGREED UPON TO NOVEMBER 30, 1918
    • FOREST ROAD PROJECTS PROJECTS APPROVED TO NOVEMBER 30, 1918
    • THE PACIFIC HIGHWAY
    • THE COLUMBIA RIVER HIGHWAY
    • COUNTY WORK SUPERVISED BY THE HIGHWAY DEPARTMENT
    • CONSTRUCTION WORK BY STATE FORCES
    • STATE HIGHWAY FUNDS
    • EQUIPMENT
    • OFFICE ORGANIZATION
    • COST KEEPING
    • EMPLOYES IN THE UNITED STATES ARMY SERVICE
      • HONOR ROLL
      • SUMMARY
      • TABLE I FUND ALLOTMENTS FROM ALL SOURCES—DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
      • TABLE II SUMMARY OF FUND ALLOTMENTS AND FUND EXPENDITURES— DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
      • TABLE III EXPENDITURES SEGREGATED BY COUNTIES (INCLUDING COUNTY FUNDS EXPENDED UNDER STATE SUPERVISION)—DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
      • TABLE IV EXPENDITURES SEGREGATED UNDER THE HEADINGS OF GENERAL ADMINISTRATION, SURVEYS, CONSTRUCTION ENGINEERING, CONSTRUCTION, EQUIPMENT AND UNCLASSIFIED.
      • TABLE V EXPENDITURES FOR CONSTRUCTION WORK DETAILED BY JOBS—DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
      • SUMMARY
      • TABLE VI EXPENDITURES FOR SURVEYS AND ENGINEERING COUNTY CONSTRUCTION DETAILED BY JOBS—DECEMBER 1, 1916, TO NOVEMBER 30, 1918
      • TABLE VII GENERAL EXPENDITURES—DECEMBER 1, 1916, TO NOVEMBER 30, 1918
      • TABLE VIII COUNTY FUNDS EXPENDED BY STATE HIGHWAY DEPARTMENT— DECEMBER 1, 1916 TO NOVEMBER 30, 1918.
      • TABLES
      • MAPS
      • TABLE A MILES OF HIGHWAY CONSTRUCTED BY HIGHWAY DEPARTMENT 1917-1918
      • TABLE B BRIDGE AND CULVERT DESIGN AND CONSTRUCTION DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
      • SUMMARY OF BRIDGE AND CULVERT DESIGN AND CONSTRUCTION
      • TABLE C MILES OF LOCATION SURVEYS MADE BY HIGHWAY DEPARTMENT 1917-1918
      • TABLE D MILES OF DIFFERENT TYPES OF ROAD IN EACH COUNTY
      • TABLE E 1918 MOTOR VEHICLE REGISTRATION BY COUNTIES
      • STATE REGISTRATION
      • TABLE F COUNTY BOND ISSUES
      • TABLE G—TABULATION OF CONTRACT PRICES GIVING UNIT PRICES OF ALL UNIT PRICE CONTRACTS FOR PAVING AND GRADING WORK, 1917-1918
      • TABLE H YEARLY EXPENDITURES OF STATE FUNDS IN COUNTIES 1914, 1915. 1916, 1917, 1918
      • TABLE I MILEAGE TABLE Main Traveled Roads
      • AUTOMOBILE ROAD MAP, SHOWING THE MAIN TRAVELED ROADS OF OREGON WITH MILEAGES Prepared by the Oregon State Highway Department
      • TABLE J OFFICIAL DESIGNATION OF STATE HIGHWAYS
      • TABLE K EMPLOYES OF THE OREGON STATE HIGHWAY COMMISSION
      • TABLE L STATE HIGHWAYS Names, Numbers, Mileages.
    • HONOR ROLL
    • SUMMARY
    • TABLE I FUND ALLOTMENTS FROM ALL SOURCES—DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
    • TABLE II SUMMARY OF FUND ALLOTMENTS AND FUND EXPENDITURES— DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
    • TABLE III EXPENDITURES SEGREGATED BY COUNTIES (INCLUDING COUNTY FUNDS EXPENDED UNDER STATE SUPERVISION)—DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
    • TABLE IV EXPENDITURES SEGREGATED UNDER THE HEADINGS OF GENERAL ADMINISTRATION, SURVEYS, CONSTRUCTION ENGINEERING, CONSTRUCTION, EQUIPMENT AND UNCLASSIFIED.
    • TABLE V EXPENDITURES FOR CONSTRUCTION WORK DETAILED BY JOBS—DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
    • SUMMARY
    • TABLE VI EXPENDITURES FOR SURVEYS AND ENGINEERING COUNTY CONSTRUCTION DETAILED BY JOBS—DECEMBER 1, 1916, TO NOVEMBER 30, 1918
    • TABLE VII GENERAL EXPENDITURES—DECEMBER 1, 1916, TO NOVEMBER 30, 1918
    • TABLE VIII COUNTY FUNDS EXPENDED BY STATE HIGHWAY DEPARTMENT— DECEMBER 1, 1916 TO NOVEMBER 30, 1918.
    • TABLES
    • MAPS
    • TABLE A MILES OF HIGHWAY CONSTRUCTED BY HIGHWAY DEPARTMENT 1917-1918
    • TABLE B BRIDGE AND CULVERT DESIGN AND CONSTRUCTION DECEMBER 1ST, 1916, TO NOVEMBER 30TH, 1918
    • SUMMARY OF BRIDGE AND CULVERT DESIGN AND CONSTRUCTION
    • TABLE C MILES OF LOCATION SURVEYS MADE BY HIGHWAY DEPARTMENT 1917-1918
    • TABLE D MILES OF DIFFERENT TYPES OF ROAD IN EACH COUNTY
    • TABLE E 1918 MOTOR VEHICLE REGISTRATION BY COUNTIES
    • STATE REGISTRATION
    • TABLE F COUNTY BOND ISSUES
    • TABLE G—TABULATION OF CONTRACT PRICES GIVING UNIT PRICES OF ALL UNIT PRICE CONTRACTS FOR PAVING AND GRADING WORK, 1917-1918
    • TABLE H YEARLY EXPENDITURES OF STATE FUNDS IN COUNTIES 1914, 1915. 1916, 1917, 1918
    • TABLE I MILEAGE TABLE Main Traveled Roads
    • AUTOMOBILE ROAD MAP, SHOWING THE MAIN TRAVELED ROADS OF OREGON WITH MILEAGES Prepared by the Oregon State Highway Department
    • TABLE J OFFICIAL DESIGNATION OF STATE HIGHWAYS
    • TABLE K EMPLOYES OF THE OREGON STATE HIGHWAY COMMISSION
    • TABLE L STATE HIGHWAYS Names, Numbers, Mileages.
    • BAKER COUNTY
      • Survey of the Baker-Cornucopia Highway
      • Baker-Cornucopia Post Road Project
    • Survey of the Baker-Cornucopia Highway
    • Baker-Cornucopia Post Road Project
    • BENTON COUNTY
    • CLACKAMAS COUNTY
      • Grading—Vicinity of New Era
      • Grading—Canemah Hill Section
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 GRADING—CANEMAH HILL (Work in progress)
      • Paving—Oregon City to Canby
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 PAVING OREGON CITY TO CANBY
      • Oswego to the Multnomah County Line
      • DETAILED EXPENDITURE STATEMENT Grading—Multnomah County Line to Oswego
      • Oregon City Bridge
    • Grading—Vicinity of New Era
    • Grading—Canemah Hill Section
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 GRADING—CANEMAH HILL (Work in progress)
    • Paving—Oregon City to Canby
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 PAVING OREGON CITY TO CANBY
    • Oswego to the Multnomah County Line
    • DETAILED EXPENDITURE STATEMENT Grading—Multnomah County Line to Oswego
    • Oregon City Bridge
    • CLATSOP COUNTY
      • Astoria-Svensen Paving
      • Svensen-Westport Macadam
      • COST STATEMENT—SVENSEN-WESTPORT MACADAM
      • John Day River Bridge
      • Big Creek Bridge
      • Plympton Creek Bridge
      • Little Creek Culvert
    • Astoria-Svensen Paving
    • Svensen-Westport Macadam
    • COST STATEMENT—SVENSEN-WESTPORT MACADAM
    • John Day River Bridge
    • Big Creek Bridge
    • Plympton Creek Bridge
    • Little Creek Culvert
    • COLUMBIA COUNTY
      • Multnomah County Line-Scappoose Paving
      • CONSTRUCTION COST OF CULVERT
      • DETAILED EXPENDITURE STATEMENT—PAVING—MULTNOMAH COUNTY LINE TO SCAPPOOSE
      • Westport-Clatskanie Macadam
      • COST STATEMENT—WESTPORT-CLATSKANIE MACADAM
      • Clatskanie-Delena Macadam
      • COST STATEMENT—CLATSKANIE-DELENA MACADAM (COST PLUS 10 PER CENT)
      • Delena-Goble Macadam
      • DETAILED EXPENDITURE STATEMENT— MACADAM—DELENA TO GOBLE
      • Rainier-Goble Macadam
      • COST STATEMENT—RAINIER-GOBLE MACADAM (STATE FORCES)
      • Goble Macadam Work
      • COST STATEMENT
      • Goble Grading Section
      • DETAILED EXPENDITURE STATEMENT—GRADING GOBLE SECTION
      • Rainier Hill Grading
      • DETAILED EXPENDITURE STATEMENT—GRADING—RAINIER HILL SECTION
      • Beaver Valley Grading
      • COST STATEMENT
      • Prescott Hill Section
      • Goble Creek Bridge
      • COST STATEMENT—GOBLE CREEK BRIDGE
      • Beaver Creek Bridges
      • Graham Creek Culvert
      • Survey—Columbia City to Scappoose
    • Multnomah County Line-Scappoose Paving
    • CONSTRUCTION COST OF CULVERT
    • DETAILED EXPENDITURE STATEMENT—PAVING—MULTNOMAH COUNTY LINE TO SCAPPOOSE
    • Westport-Clatskanie Macadam
    • COST STATEMENT—WESTPORT-CLATSKANIE MACADAM
    • Clatskanie-Delena Macadam
    • COST STATEMENT—CLATSKANIE-DELENA MACADAM (COST PLUS 10 PER CENT)
    • Delena-Goble Macadam
    • DETAILED EXPENDITURE STATEMENT— MACADAM—DELENA TO GOBLE
    • Rainier-Goble Macadam
    • COST STATEMENT—RAINIER-GOBLE MACADAM (STATE FORCES)
    • Goble Macadam Work
    • COST STATEMENT
    • Goble Grading Section
    • DETAILED EXPENDITURE STATEMENT—GRADING GOBLE SECTION
    • Rainier Hill Grading
    • DETAILED EXPENDITURE STATEMENT—GRADING—RAINIER HILL SECTION
    • Beaver Valley Grading
    • COST STATEMENT
    • Prescott Hill Section
    • Goble Creek Bridge
    • COST STATEMENT—GOBLE CREEK BRIDGE
    • Beaver Creek Bridges
    • Graham Creek Culvert
    • Survey—Columbia City to Scappoose
    • COOS COUNTY
    • CROOK COUNTY
      • Ochoco-Canyon Forest Road
    • Ochoco-Canyon Forest Road
    • CURRY COUNTY
    • DESCHUTES COUNTY
      • Bend-Lapine Cinder Macadam
      • Survey—Rolyat to One Hundred Mile Road
    • Bend-Lapine Cinder Macadam
    • Survey—Rolyat to One Hundred Mile Road
    • DOUGLAS COUNTY
      • Grading—Comstock to the Lane County Line
      • DETAILED EXPENDITURE STATEMENT—GRADING COMSTOCK TO LANE COUNTY LINE
      • Macadam—Comstock to Lane County Line
      • DETAILED EXPENDITURE STATEMENT—MACADAMIZING—COMSTOCK TO LANE COUNTY LINE
      • Grading and Macadam—Comstock to Leona
      • Grading—Oakland to Yoncalla
      • DETAILED EXPENDITURE STATEMENT—GRADING—OAKLAND TO YONCALLA
      • Grading—Myrtle Creek to Dillard
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING—MYRTLE CREEK TO DILLARD
      • Umpqua River Bridge One Mile North of Dillard
      • Bridge Two and One-half Miles South of Dillard
      • Van Tyne Creek Bridge
      • Half Viaducts North of Myrtle Creek
      • Myrtle Creek Bridge
      • Canyonville-Galesville Forest Road Project
      • Surrey—Coos County Line to Roseburg
      • Survey—Johns Ranch to Jacques Ranch
      • Survey—Canyon Creek Pass to Johns Ranch
    • Grading—Comstock to the Lane County Line
    • DETAILED EXPENDITURE STATEMENT—GRADING COMSTOCK TO LANE COUNTY LINE
    • Macadam—Comstock to Lane County Line
    • DETAILED EXPENDITURE STATEMENT—MACADAMIZING—COMSTOCK TO LANE COUNTY LINE
    • Grading and Macadam—Comstock to Leona
    • Grading—Oakland to Yoncalla
    • DETAILED EXPENDITURE STATEMENT—GRADING—OAKLAND TO YONCALLA
    • Grading—Myrtle Creek to Dillard
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING—MYRTLE CREEK TO DILLARD
    • Umpqua River Bridge One Mile North of Dillard
    • Bridge Two and One-half Miles South of Dillard
    • Van Tyne Creek Bridge
    • Half Viaducts North of Myrtle Creek
    • Myrtle Creek Bridge
    • Canyonville-Galesville Forest Road Project
    • Surrey—Coos County Line to Roseburg
    • Survey—Johns Ranch to Jacques Ranch
    • Survey—Canyon Creek Pass to Johns Ranch
    • GILLIAM COUNTY
      • Condon-Thirty Mile Creek—Macadam
      • Mayville-Wheeler County Line—Grading and Macadam
      • Columbia River Highway—Survey
    • Condon-Thirty Mile Creek—Macadam
    • Mayville-Wheeler County Line—Grading and Macadam
    • Columbia River Highway—Survey
    • GRANT COUNTY
      • Hall Hill Section—Grading and Macadamizing
      • SUMMARY OF CONSTRUCTION QUANTITIES
      • Survey of Big Basin Section of John Day Highway
      • Survey of John Day Highway From John Day to Prairie City
      • Sarvice Creek-Valades Ranch Port Road Project
      • John Day-Fisk Creek Post Road Project
      • Hall Hill-Prairie City Post Road Project
    • Hall Hill Section—Grading and Macadamizing
    • SUMMARY OF CONSTRUCTION QUANTITIES
    • Survey of Big Basin Section of John Day Highway
    • Survey of John Day Highway From John Day to Prairie City
    • Sarvice Creek-Valades Ranch Port Road Project
    • John Day-Fisk Creek Post Road Project
    • Hall Hill-Prairie City Post Road Project
    • HARNEY COUNTY
      • Survey of Central Oregon Highway—Burns-Experimental Farm Section
      • Sage Hen to Burns Section Survey
      • Glass Butte Section Survey
      • Reconnaissance Survey Burns to Vale
    • Survey of Central Oregon Highway—Burns-Experimental Farm Section
    • Sage Hen to Burns Section Survey
    • Glass Butte Section Survey
    • Reconnaissance Survey Burns to Vale
    • HOOD RIVER COUNTY
      • Grading—Cascade Locks to Hood River
      • DETAILED EXPENDITURE STATEMENT—GRADING—CASCADE LOCKS SECTION
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING AND BRIDGES—VIENTO SECTION
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING RUTHTON HILL SECTION
      • Macadamizing—Cascade Locks to Hood River
      • Hood River Bridge
      • Herman Creek Bridge
      • Gorton Creek Bridge
      • Hood River-Mosier Surveys
    • Grading—Cascade Locks to Hood River
    • DETAILED EXPENDITURE STATEMENT—GRADING—CASCADE LOCKS SECTION
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING AND BRIDGES—VIENTO SECTION
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING RUTHTON HILL SECTION
    • Macadamizing—Cascade Locks to Hood River
    • Hood River Bridge
    • Herman Creek Bridge
    • Gorton Creek Bridge
    • Hood River-Mosier Surveys
    • JACKSON COUNTY
      • Ashland Hill Grading and Undercrossing
      • COST STATEMENT ASHLAND HILL GRADING
      • Ashland Hill Paving
      • COST STATEMENT ASHLAND HILL PAVEMENT
      • Siskiyou Mountain Macadam
      • Survey—Ashland to Klamath Falls
    • Ashland Hill Grading and Undercrossing
    • COST STATEMENT ASHLAND HILL GRADING
    • Ashland Hill Paving
    • COST STATEMENT ASHLAND HILL PAVEMENT
    • Siskiyou Mountain Macadam
    • Survey—Ashland to Klamath Falls
    • JEFFERSON COUNTY
    • JOSEPHINE COUNTY
      • Grading—Wolf Creek to Grave Creek
      • DETAILED EXPENDITURE STATEMENT—GRADING—WOLF CREEK TO GRAVE CREEK
      • Grading—Locust Hill Section
      • DETAILED EXPENDITURE STATEMENT—GRADING LOCUST HILL SECTION
      • County Construction—Locust Hill to Jackson County Line
      • FINAL ESTIMATE TO ALBERT ANDERSON—GRADING BETWEEN LOCUST HILL AND JACKSON COUNTY LINE
      • Survey—Wolf Creek to Grave Creek
      • Survey—Wolf Creek to Stage Road Pass
      • Survey—Grants Pass to Grave Creek
    • Grading—Wolf Creek to Grave Creek
    • DETAILED EXPENDITURE STATEMENT—GRADING—WOLF CREEK TO GRAVE CREEK
    • Grading—Locust Hill Section
    • DETAILED EXPENDITURE STATEMENT—GRADING LOCUST HILL SECTION
    • County Construction—Locust Hill to Jackson County Line
    • FINAL ESTIMATE TO ALBERT ANDERSON—GRADING BETWEEN LOCUST HILL AND JACKSON COUNTY LINE
    • Survey—Wolf Creek to Grave Creek
    • Survey—Wolf Creek to Stage Road Pass
    • Survey—Grants Pass to Grave Creek
    • KLAMATH COUNTY
    • LAKE COUNTY
      • Grading and Macadamizing Between Lakeview and Paisley
    • Grading and Macadamizing Between Lakeview and Paisley
    • LANE COUNTY
      • Macadam—Latham to Divide
      • Divide Overcrossing
      • Survey—Goshen to Cottage Grove
    • Macadam—Latham to Divide
    • Divide Overcrossing
    • Survey—Goshen to Cottage Grove
    • LINCOLN COUNTY
      • Pioneer Mountain Grading
      • Bridge Surveys
      • Neskowin-Salmon River Survey
    • Pioneer Mountain Grading
    • Bridge Surveys
    • Neskowin-Salmon River Survey
    • LINN COUNTY
      • Albany-Jefferson Survey
    • Albany-Jefferson Survey
    • MALHEUR COUNTY
      • Survey of John Day Highway—Cow Valley-Brogan Section
      • Survey of the Central Oregon Highway—Burrell Ranch-Vale Section
      • Reconnaissance Survey of Central Oregon Highway and Jordan Valley Road
    • Survey of John Day Highway—Cow Valley-Brogan Section
    • Survey of the Central Oregon Highway—Burrell Ranch-Vale Section
    • Reconnaissance Survey of Central Oregon Highway and Jordan Valley Road
    • MARION COUNTY
      • Salem-Aurora Paving
      • The Salem Bridge
      • Surrey—Salem to Jefferson
    • Salem-Aurora Paving
    • The Salem Bridge
    • Surrey—Salem to Jefferson
    • MORROW COUNTY
      • Heppner Grading—Oregon-Washington Highway
      • Jones Hill Grading
      • Heppner Macadam
    • Heppner Grading—Oregon-Washington Highway
    • Jones Hill Grading
    • Heppner Macadam
    • MULTNOMAH COUNTY
      • COLUMBIA RIVER HIGHWAY, EAST 82D STREET VIA SANDY ROAD TO HOOD RIVER COUNTY LINE
      • VISTA HOUSE AT CROWN POINT
      • ST. HELENS ROAD, PORTLAND TO COLUMBIA COUNTY LINE LENGTH, 16 MILES
      • SUMMARY
    • COLUMBIA RIVER HIGHWAY, EAST 82D STREET VIA SANDY ROAD TO HOOD RIVER COUNTY LINE
    • VISTA HOUSE AT CROWN POINT
    • ST. HELENS ROAD, PORTLAND TO COLUMBIA COUNTY LINE LENGTH, 16 MILES
    • SUMMARY
    • POLK COUNTY
    • SHERMAN COUNTY
      • The Deschutes River Bridge.
      • Columbia River Highway Survey
      • John Day Bridge
    • The Deschutes River Bridge.
    • Columbia River Highway Survey
    • John Day Bridge
    • TILLAMOOK COUNTY
      • Paving—Tillamook South
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING AND PAVING—TILLAMOOK SECTION
      • Three Rivers Forest Project
      • Tillamook-Cloverdale Survey
    • Paving—Tillamook South
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918— GRADING AND PAVING—TILLAMOOK SECTION
    • Three Rivers Forest Project
    • Tillamook-Cloverdale Survey
    • UMATILLA COUNTY
      • Wild Horse Paving
      • DETAILED COST STATEMENT—WILD HORSE PAVING
      • Wild Horse Grading
      • Pendleton-Pilot Rock Section—Grading and Macadamizing
      • Survey of Columbia River Highway and Old Oregon Trail
      • Survey of Oregon-Washington Highway
    • Wild Horse Paving
    • DETAILED COST STATEMENT—WILD HORSE PAVING
    • Wild Horse Grading
    • Pendleton-Pilot Rock Section—Grading and Macadamizing
    • Survey of Columbia River Highway and Old Oregon Trail
    • Survey of Oregon-Washington Highway
    • UNION COUNTY
      • Union-Telocaset Section Grading
      • Elgin-Minam Section
      • La Grande-Hot Lake Grading
      • Survey of the Old Oregon Trail, Union County
      • Survey of La Grande-Joseph Highway, Union County
      • Union-Telocaset Post Road Project
      • Elgin-Minam Post Road Project
    • Union-Telocaset Section Grading
    • Elgin-Minam Section
    • La Grande-Hot Lake Grading
    • Survey of the Old Oregon Trail, Union County
    • Survey of La Grande-Joseph Highway, Union County
    • Union-Telocaset Post Road Project
    • Elgin-Minam Post Road Project
    • WALLOWA COUNTY
    • WASCO COUNTY
      • The Dalles-Three Mile Post Road Project
      • The Pine Hollow-Kingsley Post Road Project
      • Antelope Grade Post Road Project
      • Survey—Seufert to the Deschutes River
      • Deschutes River Bridge.
    • The Dalles-Three Mile Post Road Project
    • The Pine Hollow-Kingsley Post Road Project
    • Antelope Grade Post Road Project
    • Survey—Seufert to the Deschutes River
    • Deschutes River Bridge.
    • WASHINGTON COUNTY
      • Paving—Multnomah County Line to Newberg
      • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 GRADING AND PAVING MULTNOMAH COUNTY LINE TO NEWBERG
      • Onion Flat Bridge
      • Fanno Creek Bridge
      • Tualatin River Bridge
      • Votaw Undercrossing
      • Survey—Beaverton to Hillsboro
      • Survey—Forest Grove to Gaston
    • Paving—Multnomah County Line to Newberg
    • DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 GRADING AND PAVING MULTNOMAH COUNTY LINE TO NEWBERG
    • Onion Flat Bridge
    • Fanno Creek Bridge
    • Tualatin River Bridge
    • Votaw Undercrossing
    • Survey—Beaverton to Hillsboro
    • Survey—Forest Grove to Gaston
    • WHEELER COUNTY
      • Cummings Hill Grading
      • DETAILED EXPENDITURE STATEMENT—GRADING CUMMINGS HILL, SECTION
      • Bridge Creek Grading
      • DETAILED EXPENDITURE STATEMENT— GRADING BRIDGE CREEK SECTION
      • Macadamizing on Cummins Hill Section
      • Butte Creek Summit Grading
      • Grading between Cummins Hill and Fossil
      • Survey of the John Day River Highway
      • Survey of the McKenzie River Highway
      • Survey of Highway No. 14
      • Sarvice Creek-Valades Ranch Post Road Project
      • Ochoco Canyon Forest Project
    • Cummings Hill Grading
    • DETAILED EXPENDITURE STATEMENT—GRADING CUMMINGS HILL, SECTION
    • Bridge Creek Grading
    • DETAILED EXPENDITURE STATEMENT— GRADING BRIDGE CREEK SECTION
    • Macadamizing on Cummins Hill Section
    • Butte Creek Summit Grading
    • Grading between Cummins Hill and Fossil
    • Survey of the John Day River Highway
    • Survey of the McKenzie River Highway
    • Survey of Highway No. 14
    • Sarvice Creek-Valades Ranch Post Road Project
    • Ochoco Canyon Forest Project
    • YAMHILL COUNTY
      • Sheridan Paving—1917
      • COST STATEMENT—SHERIDAN PAVING—1917
      • Sheridan Paving—1918
      • COST STATEMENT—2.2 MILES, 16-FOOT CONCRETE PAVEMENT, EAST OF SHERIDAN—BUILT IN 1918
      • Paving—Multnomah County Line to Newberg
      • Survey—Grande Ronde Section
    • Sheridan Paving—1917
    • COST STATEMENT—SHERIDAN PAVING—1917
    • Sheridan Paving—1918
    • COST STATEMENT—2.2 MILES, 16-FOOT CONCRETE PAVEMENT, EAST OF SHERIDAN—BUILT IN 1918
    • Paving—Multnomah County Line to Newberg
    • Survey—Grande Ronde Section
    No review for this book yet, be the first to review.
      No comment for this book yet, be the first to comment
      You May Also Like
      Introduction to Sociology - 2nd Canadian Edition
      Free
      Introduction to Sociology - 2nd Canadian Edition
      By William Little and Little
      Immigrant and Refugee Families
      Free
      Immigrant and Refugee Families
      By Co-edited with equal contribution by Jaime Ballard
      Social Problems: Continuity and Change
      Free
      Social Problems: Continuity and Change
      By [Author removed at request of original publisher]
      Research Methods in Psychology
      Free
      Research Methods in Psychology
      By Paul C. Price, Rajiv S. Jhangiani, and I-Chant A. Chiang
      A New Perspective on Poverty in the Caribbean
      $9.99
      A New Perspective on Poverty in the Caribbean
      By Juliet Melville; Eleanor Wint
      Introduction to Design Equity
      Free
      Introduction to Design Equity
      By Kristine Miller
      Principles of Social Psychology
      Free
      Principles of Social Psychology
      By [Author removed at request of original publisher]
      Also Available On
      App store smallGoogle play small
      Categories
      Curated Lists
      • Pattern Recognition and Machine Learning (Information Science and Statistics)
        by Christopher M. Bishop
        Data mining
        by I. H. Witten
        The Elements of Statistical Learning: Data Mining, Inference, and Prediction
        by Various
        See more...
      • CK-12 Chemistry
        by Various
        Concept Development Studies in Chemistry
        by John Hutchinson
        An Introduction to Chemistry - Atoms First
        by Mark Bishop
        See more...
      • Microsoft Word - How to Use Advanced Algebra II.doc
        by Jonathan Emmons
        Advanced Algebra II: Activities and Homework
        by Kenny Felder
        de2de
        by
        See more...
      • The Sun Who Lost His Way
        by
        Tania is a Detective
        by Kanika G
        Firenze_s-Light
        by
        See more...
      • Java 3D Programming
        by Daniel Selman
        The Java EE 6 Tutorial
        by Oracle Corporation
        JavaKid811
        by
        See more...